PHOTO #2

INSTALLATION

3.Seal the spaces between frames and side box panels by tightening the butterfly ¼” nuts on the provided seal brackets (see PHOTO #3 page 8).

4.Make the electrical connections (page 8) and install the refrigeration unit (page 13).

5.Lower the ceiling panel over the Coil Assembly Frame and secure the ceiling to the fans top filler panel with 8/32” bolts in the predrilled holes (see DRAWING # 5 & PHOTO #2). Drill holes in the coil side of the ceiling through the coil filler and secure with self-taping 8/32” stainless steel screws.

PHOTO #2

DRAWING # 5

7

Page 9
Image 9