American Panel BCIP, BCCP-1, BCCP-2, AP40BC250-2-12 manual Installation, electrical power supplies

Models: AP40BC250-12 AP40BC250-2-12 BCCP-2 BCIP BCCP-1

1 42
Download 42 pages 41.88 Kb
Page 16
Image 16
electrical power supplies.

INSTALLATION

electrical power supplies.

Each wire must be connected to its corresponding terminal.

The ground wire must be connected to an efficient ground terminal.

C.3. Refrigeration Lines Installation

Follow the steps below to assure a proper installation.

1. Minimum pipe inclination has to be provided.

CONDENSING UNIT

2. Make sure you place the fastening brackets on insulated piping.

3. Provide air tight welding.

4. Create the vacuum and load the line.

5.Check for leaks.

6.Open the shut-off valves (A & B) on both sides of remote unit and of cabinet.

7.Check the exact load of refrigerant in the liquid passage gauge.

8.Check that all the refrigerant taps are open.

Use the table below to determine the number of pipe supports you need to install.

14

Page 16
Image 16
American Panel BCIP, BCCP-1, BCCP-2, AP40BC250-2-12, AP40BC250-12 manual Installation, electrical power supplies