American Power Conversion 5000VA Rack-mount to tower conversion procedure, Install two top covers

Models: 5000VA

1 25
Download 25 pages 55.09 Kb
Page 8
Image 8

Rack-mount to tower conversion procedure

The UPS and the battery modules are heavy. Remove the battery modules to lighten the UPS during installation. Refer to the battery removal instructions on the packaging.

Install stabilizer brackets

Stand the UPS on the side with the embossed marks.

Secure a stabilizer bracket (supplied), to both sides of the UPS.

Secure each bracket with two pan head locking screws (supplied).

4x

Install two top covers

Install the large top cover by placing it in the slots on the UPS and sliding the cover forward.

Install the small top cover by placing it in the slots on the UPS and sliding the cover forward.

Secure the top covers with a #8 black screw (supplied).

Install batteries

Connect only the first two batteries in the string of three batteries. Be sure that the battery connectors are fully engages.

Do not connect the single battery or the last battery installed in the string of three batteries.

Close and secure the battery doors

2x

Foam spacers

2x

4

Smart-UPS 5000 VA 208/230 Vac Tower/Rack-Mount 5U User Manual

Page 8
Image 8
American Power Conversion 5000VA user manual Rack-mount to tower conversion procedure, Install stabilizer brackets