American Power Conversion 7500/10000 VA user manual L6-20 L6-30 250V 20A 250V 30A

Models: 7500/10000 VA

1 21
Download 21 pages 7.94 Kb
Page 7
Image 7

CONNECTING POWER AND EQUIPMENT TO THE UPS

1.Hardwire the UPS (see Hardwiring).

2.Connect equipment to the UPS (cables not included for XLT/XLJ/XLTW models).

3.Turn on all connected equipment. To use the UPS as a master on/off switch, be sure that all connected equipment is switched ON.

4.Press the button on the front panel to power up the UPS.

The battery charges to 90% capacity during the first three hours of normal operation. Do not expect full battery run capability during this initial charge period.

5.Configure the Web/SNMP management card (optional).

OPTIONS

Refer to the APC web site, www.apc.com for available accessories.

External Battery Pack SURT192XLBP

Rail Kit SURTRK2

Isolation Transformer

Service Bypass Panel

CIRCUIT BREAKERS

Input Circuit Breaker 7500/10000 VA XLI/XLJ/XLT/XLTW

The UPS is protected from extreme overloads when in ON position. The breaker must be on for the UPS to operate.

Output Circuit Breaker 7500/10000 VA XLJ/XLT/XLTW

L6-20

L6-30

250V 20A

250V 30A

Output Circuit Breaker 7500/10000 VA XLI

IEC 320-C13

IEC 320-C19

10A for each

16A for each

receptacle

receptacle

5

Page 7
Image 7
American Power Conversion 7500/10000 VA user manual L6-20 L6-30 250V 20A 250V 30A