American Power Conversion SURTA2000XL Operation, Load, Percentages, Indicator Title

Models: SURTA2000XL SURTA1500XLJ SURTA1500XL

1 16
Download 16 pages 49.04 Kb
Page 6
Image 6
Operation

Operation

b. Select the COM port that is connected to the UPS. The port settings are:

Bits per second - 2400

data - bits 8

parity - none

stop bit - 1

flow control - none

c.Press Enter.

4.Once the terminal window is open, follow these steps to set the number of external battery packs (SURTA48XLBP or SURTA48XLBPJ):

a.Press Enter to initiate terminal mode. Follow the prompts.

b.Press 1 to modify UPS settings. Press e (or E) to modify the number of battery packs.

c.Enter the number of battery packs, including the internal battery module (Number of packs: 1 = internal battery module, 2 = one SURTA48XLBP or SURTA48XLBPJ, 3 = two SURTA48XLBP or SURTA48XLBPJ, etc.)

d.Press Enter.

e.Follow the prompts.

5.Exit the terminal program.

Operation

Display Panel

Load

Battery Charge

Percentages

Percentages

85%

96%

68%

72%

51%

48%

34%

24%

17%

0%

Display Panel Indicators

Indicator

Indicator Title

Description

LED

 

 

 

 

 

 

On Line

The UPS is supplying utility power to the connected equipment.

On Battery

The UPS is supplying battery power to the connected equipment.

6 Smart-UPS RT SURTA1500XL/SURTA1500XLJ/SURTA2000XL Uninterruptible Power Supply User Manual

Page 6
Image 6
American Power Conversion SURTA2000XL, SURTA1500XLJ Operation, Load, Percentages, Indicator Title, Description