American Standard 4508.801 installation instructions Fig. A, Fig. B

Models: 4508.801

1 7
Download 7 pages 42.47 Kb
Page 3
Image 3
Fig. A.

7

ATTACH CABLE CONNECTOR

 

 

 

 

 

Fig. A.

 

 

Fig. B.

 

 

 

Thread CABLE CONNECTOR (1) clockwise

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

onto DRAIN BODY CONNECTION (2) and

 

1

 

 

 

 

 

 

hand tighten. Fig. A.

 

 

 

 

 

 

 

 

 

 

 

 

Your new POP-UP DRAIN installation is now complete. Fig. B.

Note: Tailpeice on pop-up drain is 1-1/4” O.D.

Fig. B.

2

Fig. B. 1-1/4” O.D.

8 CHECK OPERATION OF POP-UP

 

Operate LIFT KNOB (1) to verify that STOPPER (2) opens and

 

closes.

1

Note: If STOPPER (2) does not open and close properly then refer to the “troubleshooting section” of these instructions.

Manual backgroundManual background 2

9 MAKE WATER SUPPLY AND WASTE CONNECTIONS

NOTE: FLEXIBLE SUPPLIES OR BULL-NOSE RISERS NOT INCLUDED AND MUST BE PURCHASED SEPARATELY.

Thread TEE BODY (4) to SPOUT SHANK (5).

Thread HOSE CONNECTOR (6, 6A) to VALVE CONNECTIONS (7, 7A).

Connect water supply to VALVE BODIES (1,1A) with 1/2" IPS FLEXIBLE SUPPLIES (2) or 3/8" O.D. BULL-NOSE RISERS (3). Use

adjustable wrench to tighten connections. Do not over tighten. Be careful not to kink copper supply when bending. Use tubing cutter to cut to proper length.

Connect HOT water supply to inlet of left SHANK and COLD

5

water supply to right SHANK using sealant, appropriate

 

connectors, and COUPLING NUTS.

 

Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to

1

waste outlet.

 

7

1/2" PIPE THREAD

6

 

2

 

1A

Manual background 7A 6A

Manual backgroundManual background COUPLING

NUT

4

3

3/8 O.D.

BULL-NOSE

RISERS COMPRESSION NUT

FLEXIBLE

SUPPLIES

COLD

Manual backgroundManual background FERRULE

HOT

3/8 COMPRESSION

 

CONNECTION

M968832 Rev . 1 . 3

3

Page 3
Image 3
American Standard 4508.801 installation instructions Fig. A, Fig. B