Index

Gas Pressure Testing

Important: This water heater and its gas connection must be leak tested before placing the appliance in operation.

If the code requires the gas lines to be tested at a pressure of 14” W.C. or greater, the water heater and its manual shut-off valve must be disconnected from the gas supply piping system and the line capped.

If the gas lines are to be tested at a pressure less than 14” W.C., the water heater must be isolated from the gas supply piping system by closing its manual shut-off valve.

U.L. recognized fuel gas and carbon monoxide(CO) detectors are recommended in all applications and should be installed using the manufacturer’s instruc- tions and local codes, rules, or regulations.

Note: Air may be present in the gas lines and could prevent the burner from lighting on initial start-up. The gas lines should be purged of air by a qualified service technician after installation of the gas piping system.

Explosion Hazard

Have a qualified service technician make sure L.P. gas pressure does not exceed 13” water column.

Failure to do so can result in death, explosion, or fire.

15

 

15

Page 15
Image 15
American Water Heater 71681, ADCG, DCG3-Series warranty Gas Pressure Testing