Recommended Tools
NOTE: Failure to follow an installation procedure could result in damage to equipment or personal injury.
Additional warnings will be displayed throughout this manual for your awareness. These warnings can be identified in warning boxes as shown in the following sample.
Andrew disclaims any liability or responsibility for the results of improper or unsafe installation, operation, or maintenance practices.
Andrew supplies all appropriate hardware/parts required for the installation of your 7.6- Meter Earth Station Antenna. All tools necessary for the installation process should be provided by the installation crew. Andrew recommends the following tools to be used for a proper installation of the
Tool | Size | Quantity |
|
|
|
Open End or Combination Wrenches | 5/16 Inch | 2 |
| 7/16 Inch | 2 |
| 9/16 Inch | 2 |
| 7/8 Inch | 2 |
| 3/4 Inch | 2 |
| 1/2 Inch | 2 |
| 1 | |
Crane | 15 Ton Minimum Capacity, extended end | 1 |
Nylon Web Slings (2000 pound breaking strength) 3 Inch by 14 Foot | 2 | |
Rope or Cord (2000 pound breaking strength) | 50 Foot | 1 |
Shackles | 5/8 Inch | 2 |
Ladder | 10 Foot Extension | 1 |
Drive Sockets | 1/16 Inch | 1 |
| 9/16 Inch | 1 |
| 7/8 Inch | 1 |
| 3/4 Inch | 1 |
| 1 | |
Breaker Bar | 1/2 Inch | 1 |
Spud Wrenches | 1 | |
| 1 | |
Screw Driver | Standard | 1 |
| Phillips | 1 |
Allen Wrench | 7/64 Inch | 1 |
| 3/16 Inch | 1 |
| 1/4 Inch | 1 |
Tape Measure (or other measuring device) | Standard | 1 |
Standard | 1 | |
Hammer | Standard | 1 |
Rubber Mallet | Standard | 1 |
Pry Bar | Standard | 1 |
Tin Snips | Standard | 1 |
Safety Gloves (each installer) | Standard | 1 |
|
|
|
Table
7 | Getting Started |