Chapter 2 Installation

Only trained service personnel should install and maintain the power supply.

Prior to installation, utility line voltage must be routed to the enclosure. Local, state, federal and/or National Electric Code (NEC) regulations regarding location, permits and electrical wiring must be adhered to.

Do not operate the power supply where the temperature and humidity are outside the specified limits. See Specifications in this manual.

Unpacking

Inspect the unit upon receipt. Notify the carrier if there is damage. The packaging is recyclable; save it for reuse or dispose of it properly. The package contains:

the enclosure

a temperature sensor

SLLP models; wiring harness product documentation

Models Supported

Model Number

Description

CTSLLGULH110S1

Enclosure, SLL-G, 120 Vac, SM Ready, UL

 

 

CTSLLPULH100S1

Enclosure, SLL-P, 120 Vac, SM Ready, UL

 

 

CTSLLGECH220S1

Enclosure, SLL-GEC, 230 Vac, SM Ready. CE

 

 

3

Page 5
Image 5
APC CTSLLP/G user manual Installation, Unpacking, Models Supported, Model Number Description