Manuals
/
Brands
/
Computer Equipment
/
Power Supply
/
APC
/
Computer Equipment
/
Power Supply
APC
- page 13
Models:
150
175kW
PDPM150G6F
PDPM150L6F
PDPM175G6H
1
13
28
28
Download
28 pages, 1.06 Mb
9
150/175kw Modular PDU Installation
3
Take the cables that are preinstalled in the Side Car and
route them through the left side into the PDU.
pdx0879a
Power In
To PDU
Contents
Main
Page
Contents
Overview.......................................................................... 1
About This Manual.......................................................... 4
Installation....................................................................... 5
Page
Overview
Important Safety Information
Disclaimer
Please Note:
Additional Safety Information
Before you begin
Operation and Adjustments
WARNING
About This Manual
Installation
Electrical Safety
SAVE THESE INSTRUCTIONS!
Inrow Installation
Maintain 36 hot aisle spacing.
Perform Equipotential Bonding
Connect and Level Enclosures
Install Input Power Cables
Top entry installation
Input Power
L1L2 L3
Bottom entry installation
Page
Install Subfeed Cables
Install User Input/Output Contacts
Page
Install the Communication Cable
Power Distribution Modules (PDMs)
Installation
Remove power distribution modules (PDMs)
Install filler plates
Options
Shielding Troughs
Seismic Stability Kit
Page
Specifications
Page
Recommended conductor sizes
Regulatory Agency Approval
Radio Frequency Interference
5/2012990-4384
APC Worldwide Customer Support