150/175kw Modular PDU Installation16
Options

Shielding Troughs

1Snap an APC-provided trough into slots on the roof of the PDU. The tabs at the base of the trough must
fit securely into the slots.
Note: Properly align the PDU trough with troughs installed on top of the enclosures located adjacent to
the PDU.
2Feed PDM cables through the roof of the PDU and into the trough system for connection with the
appropriate rack-mount PDUs.