MAINTENANCE

RECOMMENDED MAINTENANCE SCHEDULE

1 TO 2 DAYS AFTER START UP

1)Check unit operation.

2)Look in drain pan for leaks.

3)Check steam piping for leaks.

4)Observe duct low points for signs of poor humidity distribution.

5)Be sure unit is draining freely by pushing the manual drain button (the manual tank off button should not be depressed).

1 MONTH TO 1 YEAR

1)

Repeat the 5 steps outlined above.

 

2)

Clean, repair, or replace steam generator.

STEAM GENERATOR MAINTENANCE

General:

The steam generator is basically the only part of the EHU that requires regular maintenance. This maintenance may include cleaning or replacing the tank itself or the electrodes. We recommend sub- stituting a spare generator in order to minimize downtime and labor requirements. The replaced gener- ator may then be serviced when it is convenient.

Tank Cleaning:

As the water in the steam generator boils away, the minerals in that water come out of suspension and are deposited on the walls of the tank and on the electrodes. This process leaves the tank walls coat- ed with a white or light brown colored mineral buildup. This buildup may be anywhere from soft and chalky to rock hard. The automatic drain cycle will minimize mineral buildup but, eventually, the tank will need cleaning.

Tank cleaning is indicated when:

a)The unit has been in service for a period of time, a solids buildup is visible through the tank walls, and the "normal" water level in the tank is rising, or;

b)The tank cleaning message (C02) is displayed.

TO CLEAN THE TANK, PLEASE REFER TO THE "TANK REMOVAL AND REPLACEMENT" AND THE "STEAM GENERATOR CHEMICAL CLEANING PROCESS" SECTIONS OF THIS MANUAL. (PAGE 30)

Tank Replacement:

Tank replacement is indicated if the tank body becomes deformed in any way, as this could cause leakage around the o-ring.

TO REPLACE THE TANK, PLEASE REFER TO THE "TANK REMOVAL AND REPLACEMENT" SECTION OF THIS MANUAL. (Page 30)

Electrode Replacement:

Electrode disintegration generally starts due to high conductivity water being present in the steam generator. Electrode disintegration sometimes occurs as a result of a combination of the following factors:

a)High voltage (especially 480 and 600 volts);

b)Hard water (in excess of 20 grains/gal.);

c)Any unit with a malfunctioning drain system;

d)Softened water.

29

Page 29
Image 29
Armstrong World Industries EHU-703, EHU-701 Recommended Maintenance Schedule To 2 Days After Start UP, Month to 1 Year

EHU-701, EHU-700 Series, EHU-704, EHU-703 specifications

Armstrong World Industries has long been a leader in the ceiling and wall solutions industry, and its EHU-700 Series exemplifies the commitment to innovation and quality. The EHU-700 Series, which includes models such as the EHU-703, EHU-704, and EHU-701, is designed for a variety of commercial applications, combining aesthetic appeal with superior performance characteristics.

One of the key features of the EHU-700 Series is its exceptional acoustic control. The panels are crafted using advanced sound-absorbing materials that effectively reduce noise levels in busy environments. This makes them ideal for areas such as offices, schools, and healthcare facilities, where quietness can significantly enhance productivity and comfort. The EHU-700 Series has been rigorously tested and certified to meet stringent industry standards, ensuring its effectiveness in noise reduction.

Additionally, these ceiling panels are designed with durability in mind. Made from high-quality components, the EHU-700 Series is resistant to moisture and staining, making them suitable for spaces exposed to humidity, such as kitchens and restrooms. This resilience ensures that the panels maintain their aesthetic appeal over time, reducing maintenance costs for facility managers.

The EHU-700 Series also incorporates Armstrong's innovative technologies to enhance ease of installation and flexibility. The panels feature a lightweight design, allowing for straightforward handling and installation. Compatibility with various grid systems ensures that the EHU-700 Series can be easily integrated into existing architectural designs, providing a seamless finish.

Another significant aspect of the EHU-700 Series is its commitment to sustainability. Armstrong World Industries emphasizes eco-friendly manufacturing processes and materials, allowing architects and builders to achieve green building certifications, such as LEED. The use of recyclable materials in the panel composition reflects a commitment to reducing the environmental footprint.

In summary, the EHU-700 Series, including the EHU-703, EHU-704, and EHU-701 models, showcases Armstrong World Industries' dedication to quality and innovation. With unparalleled acoustic performance, durability, installation convenience, and sustainability, these ceiling panels are ideal for a wide array of commercial environments, proving to be a valuable investment for modern architectural needs. Their combination of functionality and design ensures that they meet the demands of today's dynamic spaces.