ENGLISH
ASCASO
3. Installation / Operation
The technician in charge of installation must carefully read this manual before operation of the machine, which must be carried out by qualified staff, yet respecting safety regulations in force.
The grinder must be installed in a flat and stable surface, at a height which makes operation of the machine comfortable and safe, as close as possible to the coffee machine.
The machine operator must be a responsible adult person.
Electrical installation
Before connecting the grinder to the mains, be sure of checking that the grinder specifications correspond with those of the power supply.
It is not recommended to use cord extensions nor multiple connectors.
I.1 / I.2 / steel / i·mini / i·steel machine Models operation
Assemble the coffee bean hopper 3 on its position.
Fill it with coffee beans in such an amount as to be consumed on a daily basis. Put the hopper lid 2 on its position.
Connect the power cord 7 to the mains.
Push the
Only models with a timer device (NO USA), allows the operator to adjust in advance the grinding time (a mini- mum of 8 seconds and a maximum of 60 seconds) by using regulator 6
. Every time ground coffee is required, the machine filter holder must be placed under the coffee spout 8 and guided by the switch holder fork 9 , pressing the switch 10.
Turning the timer regulator 6 clockwise will result in an increase of grinding time, whereas turning it counterclockwise decreases grinding time.(FIG.1)
14