3 A) Connect the line and extension cords one at a time, making sure to place the correct cords into

their corresponding jacks on the new module.

B)To power up the control unit, push in the main circuit breaker.

On a PARTNER Plus 220V system, move the on/off switch to the “on” position (“I”).

4

Check all green lights on the fronts of the modules. If

 

all the lights are lit, installation is complete; otherwise:

A)If a single light is out, power down the control unit, reseat the module, then power up the control unit.

If multiple lights are out, power down the control unit, reseat the first leftmost module that has a light out, then power up the control unit.

B)If the lights are still out, call the appropriate support telephone number as instructed on the inside front cover.

5 A) To replace the cover, while holding the cover at an angle, gently move the top rear edge of the cover over the top of the control unit and match up the grooves where the top edge of the cover meets the backplane. Gently push the edge into place.

B)Lower the bottom of the cover until it is secured in place.