Installation
1.Place machine on solid table.
2.Connect compressed air service of 80 PSI to air regulator input.
3.Put main plug into source of a current AC 120 VAC @ 15 Amps.
4.Turn on main switch.
5.Fill hopper with labels/transfers (For labels, adhesive side down)
6.Press Load Button, vacuum cup should pick up label from hopper. Press the Feed Button to move the label/transfer from the hopper to the Electrode Plate (Sealing head). If cup does not pick up label:
A)Check position of hopper and adjust so that vacuum cup touches labels on edge of label covered with adhesive providing good suction.
B)The number on the vacuum gauge should read 16 or higher with label on cup.
7.With a label/transfer under the sealing head, activate the hand switches. Head should now descend - putting label/transfer on shirt with the pressure shown on air gauge
8.Leveling of the press should be checked to determine that the sealing head is parallel to the base. This can be checked by sealing a carbon paper order form in the machine. This should show a nice even pressure picture. An uneven condition can be adjusted with the bolt in the rear of the base plate.
To Change Time Settings
1.To begin sequence press “OK”.
2.Press cursor knob arrow down ⇓ (The word “Parameter” will appear).
3.Press “OK”.
4.
5.Press cursor knob left ⇐.
6.Use cursor knob up⇑ or down ⇓ to change to desired time setting.
7.Press “OK”.
8.Press “ESCAPE” twice.
Users Manual | Installation • 5 |