AXIS 215 PTZ Installation Guide

Page 7

Drop ceiling mounting

1.If possible, remove the ceiling tile in which the drop ceiling mount is to be fitted.

2.Use the supplied template to mark the position for the hole in the ceiling tile. Remove the protective paper, fix to ceiling tile and cut around the template.

Note: The combined weight of the camera, ceiling mount and cover is 1.26 kg (2.78 lb). Check that the ceiling material is strong enough to support this weight. The thickness of the ceiling should be 20-60mm (0.79”-2.36”).

3.Tilt and insert the outer ceiling bracket through the hole, and then pull it into place. The bracket should be positioned so that the 3 vertical tabs point downwards in the hole.

ENGLISH

Outer ceiling bracket

4.

Pull all of the required cables

 

(network, power, etc) down through

 

the hole, ready for connection.

5.

Align the camera’s screw holes with

 

the holes in the inner ceiling

 

bracket, and using the 4 supplied

 

M4x10 screws, mount the camera

 

on the inner ceiling bracket, as

 

illustrated here.

Ceiling tile

Hole diameter 168-175mm (6.6-6.9”)

inner ceiling bracket

tabs

tabs

Page 7
Image 7
Axis Communications axis manual Drop ceiling mounting