AXIS Q7900 Installation GuidePage 5
AXIS Q7900 Rack (FrontView)
Network Activity & | PS | Fans button |
|
|
|
|
|
|
|
| |||||
Loop LEDs |
| Fan LEDs |
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
| Power supply 1 | Power supply 2 |
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| AXIS Q7900 Rack | |
|
|
| PS1 |
|
|
|
|
|
|
|
|
|
|
|
|
NETWORK | PS 2 |
|
|
|
|
|
|
|
|
|
|
|
| ||
ACTIVITY |
|
| FANS |
|
|
|
|
|
|
|
|
|
|
|
|
1 | 2 | 3 | 4 |
|
|
|
|
|
|
|
|
|
|
|
|
LOOP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
POWE R |
|
| POWE R | POWER | POWE R | POWER | POWE R | POWE R | POWE R | POWE R | POWE R | POWE R | POWE R | POWE R | POWER |
6 |
|
| 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 6 |
5 |
|
| 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 |
4 |
|
| 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 |
3 |
|
| 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 |
2 |
|
| 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
1 |
|
| 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
Slot 1 |
|
|
|
|
|
| AXIS Video |
|
|
|
|
|
| Slot 14 | |
|
|
|
|
|
|
| Encoder Blades |
|
|
|
|
|
|
Install the hardware
General placement requirements
The location of the AXIS Q7900 must meet the following requirements:
•Ambient temperature: 0° to +45°C (32° to 113°F)
•Relative humidity:
•Power source within 1.8 meters
•There must be a minimum of 5cm free space on the top, bottom, front and rear of the AXIS Q7900 to ensure adequate ventilation
•No excessive dust
Placement requirements for installation in a 19” equipment rack
When mounting the AXIS Q7900 in an equipment rack, never stack other units directly on top - the mounting brackets are not designed to support more than 1 unit.
•Pozidriv screwdriver #1
•Pozidriv screwdriver #3
•The AXIS Q7900 must be grounded to the same ground as the equipment rack.
•The equipment rack must be braced and bolted to the floor.
ENGLISH