Axor 06064XX0 installation instructions English Install the ThermoBalance II Rough

Models: 06064XX0

1 28
Download 28 pages 23.26 Kb
Page 4
Image 4

English

Install the ThermoBalance II Rough

Caution: Turn the water off at the supply before proceeding.

Both outlets must be plumbed. Do not plug any port.

Install the hot and cold supply lines to the rough. The hot supply must be connected to the hot inlet and the cold supply must be connected to the cold inlet. If the supplies are not connected to the correct inlets, the valve cannot work correctly.

(for the sake of clarity, the plastic installation box is not shown in this illustration.)

If using model 06627000: When connecting the hot and cold supplies, hold the stop steady with a wrench to avoid stop mis-alignment, and break- age of the factory sealed thread compound.

Install both outlet lines.

The valve should be level in all planes. It should be installed so that the outside surface of the finished wall falls between the minimum and maxi- mum lines on the installation box. This will insure that the trim fits properly.

Page 4
Image 4
Axor 06064XX0 English Install the ThermoBalance II Rough, Both outlets must be plumbed. Do not plug any port