6.2-Stage Compressor Units with Newer ECONWMT Economizers (See Note A)

1st stage cooling set point is the setting (SP) input into the controller. Factory default is 77F (25C). On a call for cooling the blower of the lead unit will come on immediately (if not already on – See Blower Operation), and the Stage 1 LED will blink for 10- seconds before going solid, at which time the lead unit Y1 cooling output turns on. If the outdoor temperature and humidity conditions are below the set point of the economizer control the lead unit economizer will operate instead of the compressor. If outdoor conditions are not acceptable for free cooling the compressor will automatically operate on compressor Stage 1 partial capacity instead of the economizer.

2nd cooling set point is 4F (default setting, user selectable 2-6F) warmer than Stage 1. On a call for 2nd Stage cooling the blower of the lag unit is turned on (if not already on – See Blower Operation), and the Stage 2 LED will blink for 10-seconds before going solid, at which time the lag unit Y1 cooling output turns on. If the outdoor temperature and humidity conditions are below the set point of the economizer control the lag unit economizer will operate instead of the compressor. If outdoor conditions are not acceptable for free cooling the compressor will automatically operate on compressor Stage 1 partial capacity instead of the economizer.

3rd cooling set point is 2F (default setting, user selectable 2-3F) warmer than Stage 2. On a call for 3rd Stage cooling the lead unit economizer will continue to operate as long as outdoor conditions are acceptable, and the compressor will operate on compressor Stage 1 partial capacity. If outdoor conditions are not acceptable for free cooling the lead unit compressor will automatically be operating on compressor Stage 1 partial capacity and will go to Stage 2 full capacity operation.

4th cooling set point is 2F (default setting, user selectable 2-3F) warmer than Stage 3. On a call for 4th Stage cooling the lag unit economizer will continue to operate as long as outdoor conditions are acceptable, and the compressor will operate on compressor Stage 1 partial capacity. If outdoor conditions are not acceptable for free cooling the lag unit compressor will automatically be operating on compressor Stage 1 partial capacity and will go to Stage 2 full capacity operation.

COOLING OPERATING SEQUENCES FOR NON-ALTERNATING LEAD/LEAD/LAG/ LAG CONFIGURATION

Note: Heat pumps cannot be operated in Non-Alternating Lead/Lead/Lag/Lag sequence. Selecting Heat Pump = Yes will override a Non-Alternating selection and force system to Alternating Lead/Lag/Lead/Lag sequence.

1.2-Stage Compressor Units No Economizer

1st stage1st stage cooling set point is the setting (SP) input into the controller. Factory default is 77F (25C). On a call for cooling the blower of the lead unit will come on immediately (if not already on – See Blower Operation), and the Stage 1 LED will blink for 10- seconds before going solid, at which time the lead unit compressor will start in compressor Stage 1 partial capacity operation.

2nd cooling set point is 4F (default setting, user selectable 2-6F) warmer than Stage 1, at which time the lead unit compressor will switch to compressor Stage 2 full capacity.

3rd cooling set point is 2F (default setting, user selectable 2-3F) warmer than Stage 2. On a call for 3rd Stage cooling the blower of the lag unit will come on immediately (if not already on – See Blower Operation), and Stage 3 LED will blink for 10-seconds before going solid, and then the lag unit compressor will start in compressor Stage 1 partial capacity.

4th cooling set point is 2F (default setting, user selectable 2-3F) warmer than Stage 3. On a call for 4th Stage cooling the Stage 4 LED comes on solid (no delay), and the lag unit compressor will switch to compressor Stage 2 full capacity operation.

2.1-Stage Compressor Units with Older EIFM Economizers

1st stage cooling set point is the setting (SP) input into the controller. Factory default is 77F (25C). On a call for cooling the blower of the lead unit will come on immediately (if not already on – See Blower Operation), and the Stage 1 LED will blink for 10-seconds before going solid, at which time the lead unit Y1 cooling output turns on. If the outdoor temperature and humidity conditions are below the set point of the economizer control the lead unit economizer will operate instead of the compressor. If outdoor conditions are not acceptable for free cooling the compressor will automatically operate instead of the economizer.

2nd cooling set point is 4F (default setting, user selectable 2-6F) warmer than Stage 1. On a call for 2nd Stage cooling the lead unit Y2 cooling output turns on. The lead unit economizer will close and the compressor will operate. If the compressor is already running from 1st stage cooling call due to outdoor conditions being outside of free cooling range no action occurs at 2nd stage set point.

Manual

2100-563C

Page

11 of 40

Page 11
Image 11
Bard MC4000 installation instructions Manual

MC4000 specifications

The Bard MC4000 is a state-of-the-art multi-channel wireless communication system, designed primarily for the needs of professionals in various industries. Known for its robust performance and exceptional reliability, the MC4000 is an ideal solution for events, concerts, large venues, and critical communications in diverse environments.

One of the main features of the MC4000 is its multi-channel capability, allowing it to support a range of frequencies simultaneously. This feature prevents interference from other devices and ensures clear, uninterrupted communication. The system supports multiple transmitters and receivers, enabling large teams to communicate effectively without the need for cumbersome cables.

The Bard MC4000 utilizes advanced digital signal processing technology, offering enhanced audio quality. This technology minimizes background noise and provides crisp, clear audio transmission even in challenging environments. The system also features automatic frequency selection, which scans for the best available frequencies, ensuring optimum performance at all times.

The MC4000 is designed with user-friendliness in mind, featuring an intuitive interface that allows for quick setup and operation. The clearly labeled controls and bright display make it easy for users to monitor audio levels and battery life, ensuring seamless operation during critical moments. Furthermore, the system is compatible with a variety of microphones and headsets, providing users with the flexibility to choose the equipment that best suits their needs.

Durability is another key characteristic of the Bard MC4000. Its rugged construction can withstand demanding usage in various environments, from outdoor events to industrial applications. The system also includes weather-resistant features, making it suitable for operations in adverse weather conditions without compromising functionality.

In terms of connectivity, the MC4000 supports both wired and wireless options. This versatility enables users to switch between modes depending on their needs or specific venue requirements. The built-in rechargeable battery ensures extended usage, eliminating the hassle of frequent battery replacements.

Overall, the Bard MC4000 is a versatile, high-performance wireless communication system that meets the demanding needs of modern professionals. Its combination of multi-channel support, advanced audio technology, and user-friendly design makes it an essential tool for anyone needing reliable communication in their operations. With the MC4000, users can expect clarity, durability, and performance that can keep pace with their dynamic work environments.