Figures

Figures

1-1.

Front View.

1

1-2.

Side View.

2

1-3.

Top View, Heater Head.

2

1-4

Heater Head.

3

1-5

Elements & Kettle.

3

2-1.

Packing Solid Shortening in the Kettle.

5

2-2.

Cube Melter.

5

2-3.

Installing the Cube Melter.

5

2-4.

When to Add a Cube of Shortening.

6

2-4A.

When to Add a Cube of Shortening. EZ-34 Only.

6

2-5.

Positioning the Filter Frame for Melting.

6

2-6.

When to Drain the Fryer.

7

2-6A.

When to Drain the Fryer EZ-34 Only.

7

2-7.

Positioning the Filter Assembly for Filtering.

7

2-8.

Rinsing Hose.

8

3-1.

Removing the Heater Head.

10

5-1.

EZ18-2000 Shortening Melter Assembly (120V)

17

5-2.

EZ18-2001 Shortening Melter Assembly (240V)

19

5-3.

EZ24-2000 Shortening Melter Assembly (120V)

21

5-4.

EZ24-2001 Shortening Melter Assembly (240V)

23

5-5.

EZ34-2000 Shortening Melter Assembly (120V)

25

5-6.

EZ34-2001 Shortening Melter Assembly (240V)

27

5-7

EZ24/34-1000 Heater Head Assembly

29

Belshaw Bros., Inc. š 1750 22nd Ave. S. š Seattle, WA 98144 š Phone 206-322-5474 š Fax 206-322- 5425

iv

MN-1316EN

EZ Melt Model EZ18, EZ24, EZ34

Page 6
Image 6
Belshaw Brothers EZ24, EZ34, EZ18 manual Figures