11

11A11B 11C 11D 11E11G11F
ENGLISH 1313F
13G13A13E13D13C13B
11 50/50 POP-UP INSTALLATION

13D

13A

13E

Apply a small bead of plumber’s putty underneath the Flange (11A) and place a ring of putty around Drain Opening (11B) of sink. Use PTFE plumber’s tape to all threaded fittings according to manufacturer’s instructions. Insert Flange (11A) into Drain Opening (11B). From underneath, insert Rubber Washer (11C) and Friction Washer (11D) over the bottom of Flange (11A). Thread Locknut (11E) until Rubber Washer (11C) seats securely inside Drain Opening (11B). Thread Drain Body (11F) to bottom of Flange (11A). Hand tighten and adjust the Drain Body so that the Ball Rod Opening (11G) faces the rear. Wrench tighten Locknut (11E) and wipe excess putty.

12

 

12A
12D

 

 

12C
12G12F

12D

 

 

12E

 

12B
12 BALLROD ADJUSTMENT

Drop the Stopper (12A) into the Drain Body (12B) from the top with the Off-Set (12C) facing rear. From below, insert the Ball Rod (12D) into the Ball Rod Opening

(12E) through the Stopper Hole (12F) and secure with the Nut (12G).

13C

13B

13 POP-UP ROD LINKAGE & ADJUSTMENT

Place one end of Spring Clip (13C) on end of Ball Rod (13B). Insert Ball Rod (13B) across and through hole in Strap (13D). Secure other end of Spring Clip (13C). Insert bottom of Lift Rod (13A) into hole at top of Strap (13D). Tighten with Thumb Screw (13E). Adjust Lift Rod (13A) function by adjusting location of Thumb Screw (13E) along the Strap (13D), or by adjusting the hole in which Ball Rod (13B) goes through Strap (13D). Be sure to leave enough space between Lift Rod Knob (13F) and Spout Hub (13G) when Lift Rod is down.

14

14 UNIT START UP

Turn on hot and cold water supplies, and check for leaks above and below the sink.

4