CHAPTER 3 | Installing the
Switch
Equipment
Checklist
EQUIPMENT CHECKLIST
After unpacking this switch, check the contents to be sure yo u have received all
the components. Then, before beginning t he installation, be sure you have all
other necessary installati on equipment.
PACKAGE
C
ONTENTS
24- or 48-port Gigabit Ethernet Switch (LGB6026A or LGB6050A)
Four adhesive foot pads
Bracket Mounting Kit containing two brackets and eight screw s for attaching
the brackets to the switch
Power cord—either US, Continental Europe or UK
Console cable (RJ-45 to RS-232)
This Installation Guide
Management Guide CD
OPTIONAL RACK-MOUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
– 43 –