CHAPTER 3 Installing the Switch

Equipment Checklist

EQUIPMENT CHECKLIST

After unpacking this switch, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.

PACKAGE CONTENTS

24- or 48-port Gigabit Ethernet Switch (LGB6026A or LGB6050A)

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch

Power cord—either US, Continental Europe or UK

Console cable (RJ-45 to RS-232)

This Installation Guide

Management Guide CD

OPTIONAL RACK-MOUNTING EQUIPMENT

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)