CHAPTER 4: Operation
Should the A/S-2G receive a DLE EOT (disconnect), the A/S-2G will cycle the synchro-nous DTR lead off for 2 seconds. This action will disconnect a phone line if the DTR B jumper is set for CNT.
NOTE
The A/S-2G will cycle the synchronous DTR lead off for 2 seconds whether the DLE EOT sequence comes from the synchronous or asynchronous side.
   |    | EBCDIC CHARACTERS STRIPPED  |    | 
Character  | Hex  | Character  | Hex  | 
NUL  | 00  | ACK  | 2E  | 
SOH  | 01  | DLE  | 10  | 
STX  | 02  | NAK  | 3D  | 
ETX  | 03  | SYN  | 32  | 
EOT  | 37  | ETB  | 26  | 
ENQ  | 2D  |    |    | 
   |    |    |    | 
Table 4-4. EBCDIC characters stripped.