Bloomfield 0412 Operation, Tank Must Be Full Of Water Before Connecting Brewer To Electric Power

Models: 0472 0482 0471 0443 0412

1 30
Download 30 pages 19.24 Kb
Page 10
Image 10
OPERATION

OPERATION

IMPORTANT:

TANK MUST BE FULL OF WATER BEFORE CONNECTING BREWER TO ELECTRIC POWER.

Heating elements will be damaged if allowed to operate without being fully submerged in water. Damage caused by operating the brewer without water in the tank is NOT COVERED BY WARRANTY.

Fig. 5 Fill the Tank (Automatic Units)

A.START-UP

For initial start-up, or if the brewer has not been used for an extended period of time:

Be sure spray disk and brew gasket are properly installed in the brew head.

Be sure the water supply is properly connected and the water supply valve is turned ON.

Be sure the WATER TANK IS FILLED.

IMPORTANT: Fill the water tank before energizing this brewer.

Automatic Units.

See Figure 5 at left

1.Insert the brew chamber (empty) and place an empty decanter or airpot in place under the brew chamber.

2.Remove the FILL PLUG from the fill hole.

NOTE: On Model 0412, insert provided funnel in the fill hole.

3.Pour three (3) full decanters of water into the FILL HOLE. When water flows from the brew head, the tank is full.

4.Reinstall FILL PLUG.

5.Connect the unit to electrical power.

6.Unit will begin heating water in preparation for the first brew. When the water has reached the proper temperature, the “READY” light will glow.

Pour-Over Units.

See Figure 6 at left

1.Insert the brew chamber (empty) and place an empty decanter in place under the brew chamber.

2.Open the POUR-OVER COVER.

3.Pour three (3) full decanters of water into POUR-OVER OPENING. When water flows from the brew head, the tank is full.

4.Close the POUR-OVER COVER.

5.Connect the unit to electrical power.

Unit will begin heating water in preparation for the first brew. When the water has reached the proper temperature, the “READY” light will glow.

685 77110 Owners Manual Horizon™ Brewers

Fig. 6 Fill the Tank

(Pour-Over Units)

8

Page 10
Image 10
Bloomfield 0412, 0443, 0471 Operation, Tank Must Be Full Of Water Before Connecting Brewer To Electric Power, A. Start-Up