Manuals
/
Bradford-White Corp
/
Household Appliance
/
Boiler
Bradford-White Corp
Hydronic Boiler, Water Volume Heater, BMT2V, BMT2H warranty
Models:
BMT2H
BMT2V
Hydronic Boiler, Water Volume Heater
1
17
40
40
Download
40 pages
16.65 Kb
14
15
16
17
18
19
20
21
<
>
Troubleshooting
Replacement Parts
Warranty
Maintenance
Field Wiring
Operating Temperature Control
Flow Switch
Page 17
Image 17
Brute Deluxe
(500-2000)
Page 17
Figure 8. Hydronic Piping — One Boiler,
Multi-Temperature
System.
Figure 9. Hydronic Piping -
Primary-Secondary,
Reverse-Return.
Page 16
Page 18
Page 17
Image 17
Page 16
Page 18
Contents
Brute Deluxe
Table of Contents
Model Identification
General Information
Introduction
Dimensions
Warranty
Locating the Appliance
Clearances
45¾
33¾ 16¾ 425
22¾ 505
57¾
22¾ 58¼
16¾ 46¼
28¾ 70¼
34¼ 10¼ 80¾
Combustion Air
Venting and Combustion Air
Combustion Air From Room
Intake Combustion Air
Vent Categories
Venting
Category I Vent
Common Venting Systems
Side Wall Vent Terminal
Locating Vent & Combustion Air Terminals
Side Wall Combustion Air Terminal
Vertical Vent Terminal
Combustion Air and Vent Through Side Wall
Vertical Combustion Air Terminal
Common Vent Test Boilers
Vent Terminals for Outdoor Units
Gas Supply and Piping
Natural Propane
Natural
4A.1 Heating System Piping Hot Supply Connections Boiler
Water Connections Boiler
4A.2 Cold Water Make-Up Boiler
Water Connections Water Heater
4A.3 Water Flow Requirements Boiler
4A.4 Freeze Protection Boiler
4B.2 Hot Water Supply Piping Water Heater
Electrical Connections
4B.3 Water Flow Requirements Water Heater
4B.5 Freeze Protection Water Heater
Hydronic Piping Multiple Boilers, Primary Secondary System
Hydronic Piping One Boiler, Multi-Temperature System
Water Heater Piping One Heater, One Tank
Water Heater Piping Multiple Heaters, One Tank
Water Flow Requirements BMT2V
Water Heater Piping Multiple Heaters, Multiple Tanks
Field Wiring
Main Power
Brute Deluxe 1000 Wiring Diagram
Brute Deluxe 500-750 Connection Diagram
Brute Deluxe 1000 Connection Diagram
Brute Deluxe 1250-2000 Connection Diagram
Operating Instructions
External Staging Control Wiring
Sequence of Operation
Filling the System
Operating the Burner and Set Up
Operating Temperature Control
Set Up for 0 to 2500 Feet Altitude
External Boiler Operations
High Altitude Adjustment and Set Up
System Maintenance
Maintenance
Appliance Maintenance Component Description
Shutting Down the Brute Deluxe
Temperature Control
Manual Reset High Limit Control
Flow Switch
Filter
Resolving Lockouts
Trouble Shooting
Delayed Ignition Possible Causes
Short Cycling Water Heater Parts List see next
Replacement Parts
Short Cycling Boiler
High Gas Consumption
Internal Components See Figure
Sheet Metal Components See Figure
Gas Train Components See Figure
Heat Exchanger Components See Figure
Electrical Components See Figure
Sheet Metal Components
Internal Components
Brute Deluxe Water Heater
Brute Deluxe Hydronic Boiler
Electrical Components