Manuals
/
Bradford-White Corp
/
Household Appliance
/
Boiler
Bradford-White Corp
BMT2H, BMT2V warranty Brute Deluxe 1000 Wiring Diagram
Models:
BMT2H
BMT2V
Hydronic Boiler, Water Volume Heater
1
22
40
40
Download
40 pages
16.65 Kb
19
20
21
22
23
24
25
26
<
>
Troubleshooting
Replacement Parts
Warranty
Maintenance
Field Wiring
Operating Temperature Control
Flow Switch
Page 22
Image 22
Page 22
B
RADFORD
W
HITE
C
ORP.
Figure 17. Brute Deluxe (1000) Wiring Diagram.
Figure 18. Brute Deluxe
(1250–2000)
Wiring Diagram.
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
Brute Deluxe
Table of Contents
Introduction
General Information
Model Identification
Locating the Appliance
Warranty
Dimensions
Clearances
22¾ 505
33¾ 16¾ 425
45¾
57¾
28¾ 70¼
16¾ 46¼
22¾ 58¼
34¼ 10¼ 80¾
Combustion Air From Room
Venting and Combustion Air
Combustion Air
Intake Combustion Air
Category I Vent
Venting
Vent Categories
Common Venting Systems
Side Wall Combustion Air Terminal
Locating Vent & Combustion Air Terminals
Side Wall Vent Terminal
Vertical Vent Terminal
Combustion Air and Vent Through Side Wall
Common Vent Test Boilers
Vertical Combustion Air Terminal
Natural Propane
Gas Supply and Piping
Vent Terminals for Outdoor Units
Natural
Water Connections Boiler
4A.1 Heating System Piping Hot Supply Connections Boiler
4A.3 Water Flow Requirements Boiler
Water Connections Water Heater
4A.2 Cold Water Make-Up Boiler
4A.4 Freeze Protection Boiler
4B.3 Water Flow Requirements Water Heater
Electrical Connections
4B.2 Hot Water Supply Piping Water Heater
4B.5 Freeze Protection Water Heater
Hydronic Piping Multiple Boilers, Primary Secondary System
Hydronic Piping One Boiler, Multi-Temperature System
Water Heater Piping One Heater, One Tank
Water Heater Piping Multiple Heaters, One Tank
Water Heater Piping Multiple Heaters, Multiple Tanks
Water Flow Requirements BMT2V
Main Power
Field Wiring
Brute Deluxe 1000 Wiring Diagram
Brute Deluxe 500-750 Connection Diagram
Brute Deluxe 1000 Connection Diagram
Brute Deluxe 1250-2000 Connection Diagram
Sequence of Operation
External Staging Control Wiring
Operating Instructions
Filling the System
Set Up for 0 to 2500 Feet Altitude
Operating Temperature Control
Operating the Burner and Set Up
External Boiler Operations
High Altitude Adjustment and Set Up
Appliance Maintenance Component Description
Maintenance
System Maintenance
Shutting Down the Brute Deluxe
Flow Switch
Manual Reset High Limit Control
Temperature Control
Filter
Delayed Ignition Possible Causes
Trouble Shooting
Resolving Lockouts
Short Cycling Boiler
Replacement Parts
Short Cycling Water Heater Parts List see next
High Gas Consumption
Sheet Metal Components See Figure
Internal Components See Figure
Gas Train Components See Figure
Heat Exchanger Components See Figure
Electrical Components See Figure
Sheet Metal Components
Internal Components
Brute Deluxe Hydronic Boiler
Brute Deluxe Water Heater
Electrical Components