Manuals
/
Bradford-White Corp
/
Household Appliance
/
Boiler
Bradford-White Corp
Hydronic Boiler, Water Volume Heater Brute Deluxe 500-750 Connection Diagram
Models:
BMT2H
BMT2V
Hydronic Boiler, Water Volume Heater
1
23
40
40
Download
40 pages
16.65 Kb
20
21
22
23
24
25
26
27
<
>
Troubleshooting
Replacement Parts
Warranty
Maintenance
Field Wiring
Operating Temperature Control
Flow Switch
Page 23
Image 23
Brute Deluxe
(500-2000)
Page 23
Figure 19. Brute Deluxe
(500–750)
Connection Diagram.
Page 22
Page 24
Page 23
Image 23
Page 22
Page 24
Contents
Brute Deluxe
Table of Contents
Model Identification
General Information
Introduction
Clearances
Warranty
Dimensions
Locating the Appliance
57¾
33¾ 16¾ 425
45¾
22¾ 505
34¼ 10¼ 80¾
16¾ 46¼
22¾ 58¼
28¾ 70¼
Intake Combustion Air
Venting and Combustion Air
Combustion Air
Combustion Air From Room
Common Venting Systems
Venting
Vent Categories
Category I Vent
Vertical Vent Terminal
Locating Vent & Combustion Air Terminals
Side Wall Vent Terminal
Side Wall Combustion Air Terminal
Combustion Air and Vent Through Side Wall
Vertical Combustion Air Terminal
Common Vent Test Boilers
Natural
Gas Supply and Piping
Vent Terminals for Outdoor Units
Natural Propane
4A.1 Heating System Piping Hot Supply Connections Boiler
Water Connections Boiler
4A.4 Freeze Protection Boiler
Water Connections Water Heater
4A.2 Cold Water Make-Up Boiler
4A.3 Water Flow Requirements Boiler
4B.5 Freeze Protection Water Heater
Electrical Connections
4B.2 Hot Water Supply Piping Water Heater
4B.3 Water Flow Requirements Water Heater
Hydronic Piping Multiple Boilers, Primary Secondary System
Hydronic Piping One Boiler, Multi-Temperature System
Water Heater Piping One Heater, One Tank
Water Heater Piping Multiple Heaters, One Tank
Water Flow Requirements BMT2V
Water Heater Piping Multiple Heaters, Multiple Tanks
Field Wiring
Main Power
Brute Deluxe 1000 Wiring Diagram
Brute Deluxe 500-750 Connection Diagram
Brute Deluxe 1000 Connection Diagram
Brute Deluxe 1250-2000 Connection Diagram
Filling the System
External Staging Control Wiring
Operating Instructions
Sequence of Operation
External Boiler Operations
Operating Temperature Control
Operating the Burner and Set Up
Set Up for 0 to 2500 Feet Altitude
High Altitude Adjustment and Set Up
Shutting Down the Brute Deluxe
Maintenance
System Maintenance
Appliance Maintenance Component Description
Filter
Manual Reset High Limit Control
Temperature Control
Flow Switch
Resolving Lockouts
Trouble Shooting
Delayed Ignition Possible Causes
High Gas Consumption
Replacement Parts
Short Cycling Water Heater Parts List see next
Short Cycling Boiler
Internal Components See Figure
Sheet Metal Components See Figure
Gas Train Components See Figure
Heat Exchanger Components See Figure
Electrical Components See Figure
Sheet Metal Components
Internal Components
Brute Deluxe Water Heater
Brute Deluxe Hydronic Boiler
Electrical Components