Bradley Smoker WS-1X Vertical Shroud Installation, Horizontal Shroud Installation, 4/2/07

Models: WS-1X

1 10
Download 10 pages 13.48 Kb
Page 4
Image 4
Vertical Shroud

WS-1X

Installation

Vertical Shroud

Installation

Position the shroud mounting bracket (140-904) on the wall

Aabove the shower. Secure the bracket to the wall with 1/4" fasteners (wall anchors and fasteners supplied by installer).

6-1/2"

(165mm)

4"

(102mm)

6-1/2"

(165mm)

3/4"

(19mm)

6-5/8"

(168mm)

Position the slip ring (186-1358) against the wall at the ceiling

B and in line with the shroud bracket. Secure the slip ring to the wall with 1/4" fasteners.

3"

(76mm)

Position the shroud and secure with the fasteners provided. Using the holes in

Position the shroud mounting bracket (140-904) on the wallC the top of the shroud as a template, drill and tap #10-24 holes in the slip ring with a

.149 drill bit. Secure the shroud to the slip ring.

SHOWER

Position the slip ring (186-1358) against the wall at the ceiling #10-24 SCREW (160-138)

(4) PLACES

Horizontal Shroud

Installation

Secure the brackets to the wall with A 1/4” diameter fasteners (wall anchors

and fasteners supplied by installer).

Using the horizontal shroud as a B guide, secure the slip ring to the wall with 1/4" diameter fasteners.

Using the shroud as a template, C drill and tap #10-24 holes in the

slip ring with a .149 drill bit.

.149 drill bit. Secure the shroud to the slip ring. CORNER LINE

4

4/2/07

Bradley Corporation 215-1441 Rev. C; EN 07-304

Page 4
Image 4
Bradley Smoker WS-1X Vertical Shroud Installation, Horizontal Shroud Installation, 4/2/07, slip ring with a .149 drill bit