Braun NL955 manual Maintenance and Lubrication Schedule

Models: NL955

1 55
Download 55 pages 59.77 Kb
Page 52
Image 52

Maintenance and Lubrication Schedule

continued

Perform all procedures listed in previous section also

4500

Cycles

Inspect parallel arms, bushings and pivot pins for visible wear or damage.

Inspect parallel arm pivot pin mounting bolts (8).

Inspect platform pivot pin, bushings and vertical arms for wear, damage and positive securement.

Inspect upper/lower fold arms, rotating pivot slide arms, slide support arms and associated pivot pins, bushings, and bearings for visible wear or damage.

Replace if needed.

Tighten or replace if needed.

Replace defective parts and resecure as needed. Apply Light Grease during reassembly proce- dures.

Replace if needed.

Inspect gas springs (cylinders) for wear or damage, proper operation and positive securement.

Inspect rotating pivot slide arm UHMW slide bear- ings (buttons).

Tighten, replace or correct as needed

Apply Door-Ease or replace if needed. See Lubri- cation Diagram.

Inspect vertical arm plastic covers.

Resecure or replace if needed.

Inspect power cable.

Resecure, repair or replace if needed.

Page 50

Page 52
Image 52
Braun NL955 manual Maintenance and Lubrication Schedule