Braun NL955 manual Maintenance and Lubrication Schedule

Models: NL955

1 55
Download 55 pages 59.77 Kb
Page 50
Image 50

Maintenance and Lubrication Schedule

continued

Perform all procedures listed in previous section also

1500

Cycles

Inspect switch arm components for wear or dam- age, and for proper operation.

Inspect microswitches for securement and proper adjustment.

Make sure lift operates smoothly.

Inspect external snap rings/e-clips:

Rotating pivot slide arm pivot pins (2 per pin)

Rotating pivot slide arm roller axles (2 per pin)

Platform cylinder pivot pins (2 per pin)

Platform fold axles (1 per axle)

Inboard locator lever bracket pins (1 per pin)

Lift-Titelatch gas (dampening) spring (2 per spring)

Replace defective parts.

Resecure, replace or adjust as needed.

Realign towers and vertical arms. Lubricate or correct as needed.

Resecure or replace if needed.

Inspect platform fold axles and bearings for wear or damage and positive securement.

Inspect Side Entry for proper operation, positive securement and wear or damage to nylon belt and roller chain.

Replace defective parts and resecure as needed. Apply Light Oil.

Correct or replace defective parts.

Page 48

Page 50
Image 50
Braun NL955 manual Maintenance and Lubrication Schedule