Bretford LAP30EBA manual Full row side Offset Front-left Front-right Bottom shelf

Models: LAP30EBA

1 33
Download 33 pages 3.66 Kb
Page 31
Image 31

full row side

offset

front-left

front-right

full row side

bottom shelf

 

 

 

Step 11

Carefully reinstall E-Units into position by placing bottom in first against the offset and tilting it in sideways to the top (underneath the channel bracket of the cart top panel).

When repositioned correctly, the E-Units power switch should face the front and the full row of outlets should face the door hinges.

Reinstall the E-Unit bracket assemblies (make sure that the top flange of the E-Unit is aligned with the slot in the bracket assembly) and tighten screws securely.

From underneath the bottom shelf, feed the E-Unit power cords (plug end) all the way through the bottom rear round grommeted cutouts (next to bracket assembly).

Press each E-Unit power cord into the two wire clips located (in line, behind E-Unit) on the bottom of cart. Wind power cords around the cord wrap bracket on the exterior rear panel for storage.

Unwind enough E-Unit power cord from the cord brackets on the rear panel to feed back through each grommeted hole and into the timer. Plug one E-Unit power cord into the bottom outlet of the timer marked 'A' only and the other E-Unit power cord into the bottom outlet of the timer marked 'B' only.

DO NOT PLUG BOTH E-UNIT POWER CORDS INTO ONE SIDE MARKED 'A' OR 'B' OUTLETS. THIS WILL CAUSE AN OVER LOAD DURING THE CHARGING PROCESS.

Installation is now complete and ready for use.

Page 31
Image 31
Bretford LAP30EBA manual Full row side Offset Front-left Front-right Bottom shelf