INSTALLATION

INSTALLATION

Unpacking

Delivery Inspection

Remove the Transfer Switch components shown in Figure 1 from the shipping carton.

The transfer switch is supplied ready for installation. Inspect the switch and its attached components for any shipping damage.

The inlet box is supplied ready to be wired. Inspect it, the connection cord set, and the connecting plugs for any damage. The installer will select and connect the appropriate connection cord plug to match generator receptacle.

IMPORTANT: If loss or damage is noted at time of delivery, have the person(s) making delivery note all damage on the freight bill and affix his signature under the consignor's memo of loss or damage. If loss or damage is noted after delivery, contact the carrier for claim procedures. Freight damaged parts are not warranted.

Items Not Shipped with Transfer Switch:

The following items, required for system installation, are not included and must be provided by the installer:

1.Tools required for installation

2.Anchors and screws to mount the transfer switch components and conduit.

3.Conduit, fittings, wire nuts, and insulated copper wire for connecting the transfer switch to the outside inlet box and main distribution panel.

Figure 1 — Transfer Switch Components

 

Transfer Switch

 

(Model 071014 shown)

 

Manual

Connecting Cord Set

Connecting Plugs

 

 

Inlet Box

6