![](/images/new-backgrounds/1058313/5831377x1.webp)
NOTE: Starting at furnace, slope vent pipe a minimum of
VENT TERMINATION
General
Roof termination is preferred since it is less susceptible to damage or contamination, and it has less visible vent vapors. Sidewall termination require sealing or shielding of building surfaces with a corrosive resistance material due to corrosive combustion products of vent system.
NOTE: (Direct Vent /
When determining appropriate location for termination, consider the following guidelines:
1.Comply with all clearance requirements stated in Fig. 34 or Fig. 35 per application.
2.Termination or termination kit should be positioned where vent vapors will not damage plants/shrubs or air condi- tioning equipment.
3.Termination or termination kit should be positioned so that it will not be affected by wind eddy, such as inside build- ing corners, nor by recirculation of flue gases, airborne leaves, or light snow.
4.Termination or termination kit should be positioned where it will not be damaged by or subjected to foreign objects such as stones, balls, etc.
5.Termination or termination kit should be positioned where vent vapors are not objectionable.
Extended Exposed Sidewall Pipes
Sidewall combustion air pipe termination (direct Vent /
1.Determine combustion air pipe diameter (direct Vent /
2.Using winter design temperature (used in load calcula- tions), find appropriate temperature for your application and furnace model.
3.Determine required insulation thickness for exposed pipe length(s).
NOTE: Pipe length (ft / M) specified for maximum pipe lengths located in unconditioned spaces cannot exceed total allowable pipe length as specified in Table 6.
Vent Termination Kit (Direct Vent / 2-Pipe System Only)
NOTE: Always refer to the instructions in termination kit for the latest version.
Combustion air and vent pipes MUST terminate outside structure. A factory accessory termination kit must be installed as shown in Table 8. There are four options of vent/combustion air termination kits available as shown in Table 8.
NOTE: Combustion air pipe must have the same diameter as vent pipe.
Concentric Vent / Combustion Air Termination Kit (Direct Vent /
Determine an appropriate location for termination kit using the guidelines provided in section “Vent Termination: General” in this instruction.
1.Cut one
2.Loosely assemble concentric vent/combustion air termina- tion components together using instructions in kit.
3.Slide assembled kit with rain shield REMOVED through hole.
NOTE: Do not allow insulation or other materials to accumulate inside of pipe assembly when installing it through hole.
Roof
Sidewall
4.Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping.
5.Check required dimensions as shown.
Two-Pipe Termination Kit (Direct Vent / 2-Pipe System
Only)
Determine an appropriate location for termination kit using the guidelines provided in section “Vent Termination: General” in this instruction.
1.Cut 2 holes, 1 for each pipe, of appropriate size for pipe size being used.
2.Loosely install elbow in bracket and place assembly on
Roof
For applications using
Sidewall
For applications using vent pipe option indicated by dashed lines in Fig. 36, rotate vent elbow 90_ from position shown in Fig. 36.
3.Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping.
4.Check required dimensions as shown in Fig. 36.
(Direct Vent /
355CAV
39