I. PRELIMINARY INFORMATION
OUTDOOR: MODEL NO.  | 
  | 
  | 
  | SERIAL NO.  | 
  | |||
INDOOR: AIR HANDLER MANUFACTURER  | 
  | 
  | 
  | 
  | 
  | |||
MODEL NO.  | 
  | 
  | SERIAL NO.  | 
  | ||||
ADDITIONAL ACCESSORIES  | 
  | 
  | 
  | 
  | 
  | 
  | ||
II. PRE-START-UP 
OUTDOOR UNIT | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
IS THERE ANY SHIPPING DAMAGE?  | 
  | 
  | 
  | 
  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | |||||
IF SO, WHERE:  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
WILL THIS DAMAGE PREVENT UNIT   | 
  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |||
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?  | (Y/N)  | 
  | 
  | 
  | |||||||||||
HAS THE GROUND WIRE BEEN CONNECTED?  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |||
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?  | (Y/N)  | 
  | 
  | ||||||||||||
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?  | (Y/N)  | 
  | 
  | ||||||||||||
HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED (Snubber washers are snug, but not tight)?
(Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
CONTROLS | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
ARE THERMOSTAT AND   | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||||||||||
CONNECTIONS MADE AND CHECKED?  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |||
ARE ALL WIRING TERMINALS (including main power supply) TIGHT?  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | ||||||||||||
HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS?  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | |||||||||||||
INDOOR UNIT | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?  | (Y/N)  | 
  | 
  | 
  | |||||||||||||||
ARE PROPER AIR FILTERS IN PLACE?  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?  | (Y/N)  | 
  | 
  | 
  | |||||||||||||||
DO THE FAN BELTS HAVE PROPER TENSION?  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |||||||
HAS CORRECT FAN ROTATION BEEN CONFIRMED?  | 
  | (Y/N)  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||||||||
PIPING | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
IS LIQUID LINE SOLENOID VALVE LOCATED AT THE EVAPORATOR COIL AS REQUIRED?  | (Y/N)  | ||||||||||||||||||
HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, CONDENSER, EVAPORATOR,
TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS
WITH A LEAK DETECTOR?  | (Y/N)  | 
LOCATE, REPAIR, AND REPORT ANY LEAKS.
ARE ALL 576B COMPRESSOR SERVICE VALVES FULLY OPENED (BACKSEATED)? (Y/N)
HAVE LIQUID LINE SERVICE VALVE AND SUCTION LINE SERVICE VALVE BEEN OPENED? (Y/N)
IS THE OIL LEVEL IN COMPRESSOR CRANKCASE ON 576B UNIT IN VIEW IN THE COMPRESSOR SIGHT GLASS? (Y/N)
CHECK VOLTAGE IMBALANCE | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |
AB  | 
  | V  | AC  | 
  | 
  | V  | BC  | V  | |||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |
(AB + AC + BC)/3 = AVERAGE VOLTAGE =  | 
  | 
  | 
  | V  | 
  | 
  | 
  | 
  | 
  | ||||
MAXIMUM DEVIATION FROM AVERAGE VOLTAGE =  | 
  | 
  | 
  | V  | 
  | 
  | |||||||
VOLTAGE IMBALANCE = 100 X (MAX DEVIATION)/(AVERAGE VOLTAGE) =  | 
  | 
  | %  | ||||||||||
IF OVER 2% VOLTAGE IMBALANCE, DO NOT ATTEMPT TO START SYSTEM!  | 
  | 
  | |||||||||||
CALL LOCAL POWER COMPANY FOR ASSISTANCE.  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||||||