45 Series Rotary Tiller

ASSEMBLY

The machine is shipped with the PTO shaft not installed.

To install the PTO driveline on the machine, follow this procedure:

1.Clear the area of bystanders, especially small children.

2.Clean the splines on the yoke and the input shaft.

3.Align the splines on the yoke and the shaft.

4.Attach the driveline to the tiller by removing the tapered pin and sliding the yoke onto the gearbox shaft. Line up the pin with the groove in the gearbox shaft and fasten with the tapered pin. The plastic gearbox PTO guard has a removable door on top to access the pin. The A-frame brace can be removed to improve accessibility. Replace the brace after tightening the nut on the tapered pin.

5.Be sure the yoke is locked in position. Pull on the yoke to be sure the pin clicks into position.

6.Be sure that the PTO shaft is the appropriate length for the tractor/Tiller combination. Refer to Driveline Dimension Section for details.

-25-

Page 26
Image 26
Buhler 45 Series warranty Assembly