Bunn 2 manual Initial Setup Cont

Models: 2

1 34
Download 34 pages 42.8 Kb
Page 5
Image 5
INITIAL SETUP (CONT.)

INITIAL SETUP (CONT.)

9.Align the auger shaft with the flat fin of the auger. Push the augers as far as they will go and rotate them so the flat fin is fac- ing up.

12.Slide them into place and push them down until the hopper lock plungers snap into place. For models without PAF, pro- ceed to step 15.

15.Set the lids on the hoppers. Lift slightly and slide back or front for filling.

10.Install auger nose bushing into inside front of hopper.

13.For models with PAF, install level probes into slots at top rear of PAF hoppers.

16.Plug in the hopper lid lamp cords.

11.Thoroughly rinse the hoppers and install them over the augers and cooling drums.

14.Install PAF unit onto platform and plug power cord into rear of platform. Plug platform power cord into proper outlet. (Refer to PAF manual for water con- nections)(Proceed to step 17)

17.Assemble the drip tray.

5

32080.0001 021105

 

Page 5
Image 5
Bunn 2 manual Initial Setup Cont