Bunn FMD-1, FMD-2 service manual SERVICE cont, Test Procedure

Models: FMD-2 FMD-1

1 40
Download 40 pages 10.43 Kb
Page 30
Image 30
Manual background

SERVICE (cont.)

LEVEL CONTROL BOARD AND LEVEL PROBE - FMD-1 ONLY (cont.)

Test Procedure:

1.Disconnect the dispenser from the power source.

2.Remove the violet wire from terminal 1 & pink wire from terminal 4 of the circuit board.

3.Check the voltage across terminals 2 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models.

4.Disconnect the dispenser from the power source.

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to the wiring diagram and check the dispenser wiring haness.

5.Reconnect the violet wire to terminal 1.

6.Carefully connect a piece of insulated jumper wire to terminal 4. Keep the other end of this wire away from any metal surface of the dispenser.

7.Check the voltage across terminals 1 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models after a delay of approximately 5 seconds.

8.Touch the free end of jumper wire to the compo- nent bracket. The indication must be 0.

9.Move the jumper wire away from the component bracket. The indication must again be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models , three wire 120/240 volt models after a delay of approximately 5 seconds.

10.Disconnect the dispenser from the power source and remove the jumper wire from terminal 4.

If voltage is present as described, the level control board is operating properly, proceed to #11.

If voltage is not present as described, replace the level control board.

11.Reconnect the pink wire to terminal 4.

12.Gently pull the probe out of the tank lid and inspect for corrosion. Replace it if necessary.

13.Place the probe so that neither end is in contact with any metal surface of the dispenser.

14.Check the voltage across terminals 1 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models after a delay of approximately 5 seconds.

15.Move the probe's flat end to the tank. The indica- tion must be 0.

16.Move the probe's flat end away from the tank. The indication should again be 120 volts ac for two

wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models after a delay of approximately 5 seconds.

If voltage is present as described, reinstall the probe, the level control board and level probe are operating properly.

If voltage is not present as described, check the pink probe wire for continuity.

Removal and Replacement:

1.Remove all wires from the level control board.

2.Remove two #8-32 keps nuts holding level control board to right side of the component bracket.

3.Remove level control board and spacers.

4.Install the new level control board and spacers to the right side of the component bracket using two #8-32 keps nuts.

5.Refer to Fig. 26 when reconnecting the wires.

TI VIO to Inlet Solenoid Coil

T2 BLK to Main Harness

T3 WHI to Main Harness

T4 PNK to Probe

P1671

FIG. 26 LEVEL BOARD TERMINALS

30

29112 101598

 

Page 30
Image 30
Bunn FMD-1, FMD-2 service manual SERVICE cont, Test Procedure