Bunn ULTRA-2 manual Installation

Models: ULTRA-2

1 23
Download 23 pages 57.86 Kb
Page 21
Image 21
INSTALLATION

INSTALLATION

1.Install the seals over the flange 2. Align the auger shafts with the

at the rear of the cooling drums

augers. Push the augers as far

and press the seals firmly into

as they will go and rotate them

place as shown.

so the flat face of the auger

 

shaft is aligned with the flat face

 

of the auger nose.

4.Thoroughly rinse the hoppers 5. Slide them into place and push

and install them over the augers

them down until the hopper

and cooling drums.

lock plungers snap into place.

7.Position the faucet seal and re- 8. Slide the faucet valve assembly

turn spring in the faucet valve.

into place on the hopper.

10.Assemble the drip tray.

3.Install auger nose bushing into inside front of hopper.

6.Set the lids on the hoppers and

plug in the hopper lid lamp cords. Manual background

9.Press down on the valve to compress the spring. Position the faucet handle over the fau- cet valve one side at a time and snap into place on the hopper.

21

32080 053102

 

Page 21
Image 21
Bunn ULTRA-2 manual Installation