Manuals
/
Burnham
/
Kitchen Appliance
/
Ventilation Hood
Burnham
101008-01R1-2/07
manual
Models:
101008-01R1-2/07
1
69
80
80
Download
80 pages
59.55 Kb
66
67
68
69
70
71
72
73
<
>
Troubleshooting
Specification
Install
Parts list
Wiring Connections Diagram
Wiring
Warranty
Dimension
Maintenance
Outdoor Reset Curve
Page 69
Image 69
69
Page 68
Page 70
Page 69
Image 69
Page 68
Page 70
Contents
Freedom
Table of Contents
Product Description
Specifications
II Specifications
Maximum Vent Lengths
IV Locating the Boiler
III Before Installing
Clearances To Combustible Or Non-combustible Material
Clearances from Vent Piping to Combustible Construction
Mounting The Boiler
Wall Mounting
Floor Mounting
Wall Mounting Hole Locations
Boiler Mounting/Hardware
VI Air for Ventilation
Page
Vent System Design
VII Venting
Page
Or PVC
Summary of Horizontal Venting Options
Horizontal Concentric Venting Vent Option
Size Vent
U.S. Boiler Concentric Vent Components Vent Option
6c Positioning Vent Terminal Under Overhangs
VENT/ AIR Intake Fitting Equivalent Length
Roof
Summary of Vertical Venting Options
Never Common Vent a FCM Boiler with Other Appliances
Removing an Existing Boiler From a Common Chimney
Assembly of U.S. Boiler 60/100mm Concentric Venting
11 Dimension L
12 Cutting Outer Pipe
14 Preparing Terminal Section for Installation in the Wall
16 Installation of Stainless Steel Vent Collar
Assembly of Stainless Steel Venting
17a Star-34 Connection to Vent Collar
18 Z-Vent III Connection to Vent Collar
19 SAF-T Vent EZ Seal Connection to Vent Collar
20 FasNSeal Connection to Vent Collar
Condensate Trap and Drain Line
21 Condensate Piping Arrangement
Gas Connection To Boiler
Viii Gas Piping
IX System Piping
General System Piping Precautions
System Design
Flow Requirements Through Boiler
Method 1 Primary/Secondary Piping
Piping Method #1 Heat Only
Piping Method #1 Heat + Indirect Water Heater
4b Piping Method #1 Indirect Water Heater Loop Piping Shaded
Pipe and Circulator Sizing for Indirect Water Heater Loop
Pipe and Circulator Sizing for Boiler Loop
Fitting Equivalent Lengths
Boiler Head Loss
Standard Piping Installation Requirements
Piping for Special Situations
11 Chiller Piping
Wiring
Wiring Connections Diagram
Ladder Diagram
Page
Never Attempt to Fill a HOT Empty Boiler
XI Start-up and Checkout
Water Quality and Boiler Water Additives
FCM Series Lighting and Operating Instructions
SWT
Typical CO2/O2 Combustion Readings Range
Gas Valve Detail
Page
XII Operation
Normal Display In Standby Mode
Page
Basic Menu Tree
First Digit Boiler Status
Boiler Status
Outdoor Reset Curve
XIII. Service and Maintenance
Page
No Error Code Displayed
XIV. Troubleshooting
Code Condition Possible Causes
Soft Lockout Codes Displayed
Hard Lockout Codes Displayed
XV Parts
Page
KEY Description
Parts List
Page
Parts List
Page
Page
Page
DISP4D
150 151 152 153 154 155
156 157 158 159 160 161
162
Page
Page
Page
Page
Page
Limited Warranty
Top
Page
Image
Contents