Burnham V7 SERIES manual CAD Cell Location and Service, Flame Failure

Models: V7 SERIES

1 47
Download 47 pages 45.49 Kb
Page 23
Image 23

(Non-Burnham Drawing,

Copy from LE Manual, 81433010R4, Page 13, without "Figure 12A, 12B, 12C and 12D"; sample enclosed)

Fig. 24: "L1" and "V1" Head Electrode Positioning and Gun Setting (Beckett AFG)

5.TURN “OFF” BURNER and remove pressure gauge. Install gauge port plug and tighten. Start burner again.

6.CAD CELL LOCATION AND SERVICE

The burner is supplied with a cadmium sulfide flame detector mounted at the factory, mounted on the bottom of the ignitor. See Figure 25. To service cad cell or to replace the plug in portion, swing open the ignitor. After service is complete, be sure to fasten down the ignitor.

7. FLAME FAILURE

 

The V7 boiler controls operate the burner

 

automatically. If for unknown reasons the burner

 

ceases to fire and the reset button on the primary

 

control has tripped, the burner has experienced

 

ignition failure. Before pressing the reset button

Figure 25: Cad Cell Location

call your serviceman immediately.

 

23

Page 23
Image 23
Burnham V7 SERIES manual CAD Cell Location and Service, Flame Failure