Burnham V9A manual Water Boiler Pressure Relief Valve Hook-Up

Models: V9A

1 64
Download 64 pages 10.08 Kb
Page 44
Image 44

O.ELECTRIC WIRING - Install all field wiring in accordance with the National Electric Code and Local Regulations.

Control voltage and/or 3-phase line voltage must be supplied to the burner panel box through a fused disconnect.

Figure 38b: Water Boiler - Pressure Relief

Valve Hook-Up

Figure 38a: Steam Boiler - Safety Valve Hook-up

44

Page 44
Image 44
Burnham V9A manual Water Boiler Pressure Relief Valve Hook-Up