See Figure 12.
CAUTION
Do not apply pressure directly on threaded tappings on front and rear sections with
Rods should be approximately centered in openings so that rods and couplings (when used) do not drag on pipe thread in end section tappings.
WARNING
READ THE STATEMENTS BELOW BEFORE ATTEMPTING TO USE HYDRAULIC EQUIPMENT.
•Release pressure in ram pumps before attempting to remove clamps.
•Do not stand in line with
•Do not operate ram against
•Do not operate pump after ram has reached stroke limit.
Figure 10: Front and Rear Section Channel
Figure 11: Center Section Channel Block Position
(Partial Block Draw-Up)
The large
h. Excess length of |
beyond front and rear section to ensure proper fit |
of jacket, adjust accordingly. Tighten all tie rod |
nuts until finger tight. Then tighten them an |
additional ½ turn with a wrench. |
C. HYDROSTATIC TEST — After the boiler sections |
have been assembled, it is essential that the boiler be |
hydrostatically tested before the canopy, flue cover |
plates, jacket, or piping is installed. |
1. Tankless Heater Installation |
If boiler is ordered with tankless heaters, install |
heaters with the gaskets provided. Table IV gives |
18
Block Positions (Hydraulic Draw-Up)
e.
Use hydraulic rams to draw up sections by applying pressure alternately on the
f. Continue to
g. After all sections have been drawn up, but before removing the hydraulic rams and
the maximum number of heaters permissible per |
assembly and the heater ratings. |
2. Plug all boiler tappings and fill boiler completely |
with cold water. |
CAUTION
Do not install gauge until after hydrostatic testing the boiler. Gauge failure may result.
3.All completed boilers must satisfactorily pass the prescribed hydrostatic test.