Table 2 Ð Overall Dimensions, 16DF013-025

Table 2 Ð Overall Dimensions, 16DF013-025

English

UNIT

 

 

OVERALL DIMENSIONS (ft-in.)

 

 

16DF

013

015

018

020

023

025

LENGTH

11-10

11-10

11-10

11-10

11-10

11-10

WIDTH

6-

7

6-

7

7-

8

7-

8

8-

3

8-

3

HEIGHT

7-

9

7-

9

7-

9

7-

9

8-

3

8-

3

 

 

 

 

 

SI

 

 

 

 

 

 

 

UNIT

 

 

OVERALL DIMENSIONS (mm)

 

 

16DF

013

015

018

020

023

025

LENGTH

3600

3600

3600

3600

3600

3600

WIDTH

1995

1995

2330

2330

2520

2520

HEIGHT

2350

2350

2350

2350

2500

2500

Table 3 Ð Overall Dimensions, 16DF028-050

English

UNIT

 

OVERALL DIMENSIONS (ft-in.)

 

16DF

028

032

036

040

045

050

LENGTH

15-4

15-4

15- 4

15- 4

15-4

15-4

WIDTH

9-4

9-4

9-10

9-10

10-6

10-6

HEIGHT

8-6

8-6

8-10

8-10

9-8

9-8

 

 

 

SI

 

 

 

UNIT

 

OVERALL DIMENSIONS (mm)

 

16DF

028

032

036

040

045

050

LENGTH

4660

4660

4660

4660

4660

4660

WIDTH

2850

2850

3000

3000

3200

3200

HEIGHT

2595

2595

2695

2695

2950

2950

RIGGING Ð The 2 pieces are the high-temperature generator- separator assembly and absorber-evaporator low-temperature generator assembly (Fig. 6).

1.Lift each assembly with cable, hooks, and shackles con- nected to the 4 lifting holes on each assembly. Lifting from other holes or locations can damage the machine.

2.Position and level the absorber-evaporator-assembly first. See Position and Level the Equipment section.

3.Move the generator-separator assembly into place beside the absorber-evaporator assembly.

4.Align connecting piping for generator-separator and absorber- evaporator assemblies. Make sure serial numbers corre- spond on both assemblies.

5.See Mounting the Burner section for burner rigging instructions.

Position and Level the Equipment Ð Isolation pads are not necessary for most installations. However, for cases where isolation pads are required, refer to Fig. 7 for typical installation.

Both 16DF machine assemblies must be level within 1¤4 in. per 20 ft (6.3 mm per 6 m), both lengthwise and di- agonally. To level the machine, proceed as follows:

1.Completely ®ll 50-ft (15 m) length of clear ¯exible tub- ing with water.

2.Use water gage and leveling reference points stamped on tube sheets to level machine.

3.Level machine with shims until requirements are met. If isolation assembly is used, shim under the soleplate. Be sure matching piping is in alignment.

Absorber-Evaporator Low-Temperature Generator Assembly

High-Temperature Generator-Separator Assembly

Fig. 6 Ð Rigging 2-Piece Units, Sizes 16DF023-050

NOTES:

1.Be sure only the machine base is on the isolation pad at each corner.

2.Shim under soleplate to level machine.

Fig. 7 Ð Typical Isolation Assembly