Carrier 38YSA ConnectingTubing Installation, Dimensions In, MountingUnit to Pad, ElevateUnit

Models: 38YSA

1 12
Download 12 pages 12.23 Kb
Page 2
Image 2
Fig. 2—Connecting Tubing Installation

NOTE: Avoid contact between tubing and structure

OUTDOOR WALL INDOOR WALL

CAULK

Step 2—Install on a Solid, Level Mounting PadLIQUID TUBE

VAPOR TUBE

INSULATION

THROUGH THE WALL

JOIST

HANGER STRAP

(AROUND VAPOR

TUBE ONLY)INSULATION VAPOR TUBE

1MIN.

LIQUID TUBE

SUSPENSION

A94028

Fig. 2—Connecting Tubing Installation

INSPECT EQUIPMENT

File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit rating plate on unit corner panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications.

Step 2—Install on a Solid, Level Mounting Pad

If conditions or local codes require the unit be attached to pad, tie down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit mounting pattern in Fig. 3 to determine base pan size and knockout hole location.

On rooftop applications, mount on level platform or frame 6 in. above roof surface.. Place unit above a load-bearing wall and isolate unit and tubing set from structure. Arrange supporting members to adequately support unit and minimize transmission of vibration to building. Consult local codes governing rooftop applications.

Roof mounted units exposed to winds above 5 mph may require wind baffles to achieve adequate defrost. Consult Low-Ambient Guideline for wind baffle construction.

NOTE: Unit must be level to within ± 2° (± 3/8 in./ft) per compressor manufacturer specifications.

Step 3—Clearance Requirements

When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 30-in. clearance to service end of unit and 48 in. above unit. For proper airflow, a 6-in. clearance on 1 side of unit and 12 in. on all remaining sides must be maintained. Maintain a distance of 24 in. between units. Position so water, snow, or ice from roof or eaves cannot fall directly on unit.

On rooftop applications, locate unit at least 6 in. above roof surface.

3/8-IN. DIA TIEDOWN KNOCKOUTS IN BASEPAN

(2) PLACES

A

CL

Step 3—Clearance Requirements B

 

VIEW FROM TOP

 

 

 

 

8 3/16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A97548

 

 

 

 

 

 

 

 

 

 

Dimensions (In.)

 

 

 

 

 

 

 

 

 

 

 

MINIMUM MOUNTING

 

TIEDOWN KNOCKOUT

UNIT

PAD DIMENSIONS

 

 

LOCATIONS

SIZE

Support

 

Snow

 

 

A

 

B

 

Feet

 

Stand

 

 

 

 

 

 

 

 

 

 

024–042

26 X 32

 

31 X 35

4

9-3/4

048

34 X 42

 

36 X 46

5-5/16

11-13/16

 

 

 

 

 

 

 

 

 

Fig. 3—Mounting Unit to Pad

Step 4—Operating Ambients

The minimum outdoor operating ambient in cooling mode is 55°F, and the maximum outdoor operating ambient in cooling mode is 125°F. The maximum outdoor operating ambient in heating mode is 66°F.

Step 5—Elevate Unit

Accumulation of water and ice in base pan may cause equipment damage.

Elevate unit per local climate and code requirements to provide clearance above estimated snowfall level and ensure adequate drainage of unit. Fig. 4 shows unit with accessory support feet installed. Use accessory snow stand in areas where prolonged freezing temperatures are encountered. Refer to separate Installa- tion Instructions packaged with accessories.

A98533

Fig. 4—Accessory Support Feet

2

Page 2
Image 2
Carrier 38YSA ConnectingTubing Installation, Dimensions In, MountingUnit to Pad, AccessorySupport Feet, OperatingAmbients