Step 14— Final Checks
IMPORTANT: Before leaving job, be sure to do the following:
1.Securely fasten all panels and covers.
2.Tighten service valve stem caps to
3.Leave User’s Manual with owner. Explain system operation and periodic maintenance requirements outlined in manual.
4.Fill out Dealer Installation Checklist and place in customer file.
CARE AND MAINTENANCE
For continuing high performance and to minimize possible equip- ment failure, periodic maintenance must be performed on this equipment.
Frequency of maintenance may vary depending upon geographic areas, such as coastal applications.
Table 3— Required Liquid-Line Temperature (° F)
LIQUID |
| REQUIRED SUBCOOLING |
| ||||
PRESSURE AT |
|
| TEMPERATURE |
| |||
SERVICE VALVE |
|
|
| (° F) |
| ||
(PSIG) | 5 |
| 10 |
| 15 |
| 20 |
134 | 71 |
| 66 |
| 61 |
| 56 |
141 | 74 |
| 69 |
| 64 |
| 59 |
148 | 77 |
| 72 |
| 67 |
| 62 |
156 | 80 |
| 75 |
| 70 |
| 65 |
163 | 83 |
| 78 |
| 73 |
| 68 |
171 | 86 |
| 81 |
| 76 |
| 71 |
179 | 89 |
| 84 |
| 79 |
| 74 |
187 | 92 |
| 87 |
| 82 |
| 77 |
196 | 95 |
| 90 |
| 85 |
| 80 |
205 | 98 |
| 93 |
| 88 |
| 83 |
214 | 101 |
| 96 |
| 91 |
| 86 |
223 | 104 |
| 99 |
| 94 |
| 89 |
233 | 107 |
| 102 |
| 97 |
| 92 |
243 | 110 |
| 105 |
| 100 |
| 95 |
253 | 113 |
| 108 |
| 103 |
| 98 |
264 | 116 |
| 111 |
| 106 |
| 101 |
274 | 119 |
| 114 |
| 109 |
| 104 |
285 | 122 |
| 117 |
| 112 |
| 107 |
297 | 125 |
| 120 |
| 115 |
| 110 |
309 | 128 |
| 123 |
| 118 |
| 113 |
321 | 131 |
| 126 |
| 121 |
| 116 |
331 | 134 |
| 129 |
| 124 |
| 119 |
346 | 137 |
| 132 |
| 127 |
| 122 |
359 | 140 |
| 135 |
| 130 |
| 125 |
|
|
|
|
|
|
|
|
Copyright 2002 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231 | 38ysa4si |
|
|
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book | 1 | 4 | PC 101 | Catalog No. | Printed in U.S.A. | Form | Pg 12 | Replaces: 38YSA3SI | ||
| Tab | 5a | 5a |
|
|
|
|
|
|
|