Carrier 62E Job Name, Start-UpPerformed By, ERV Unit Designation, Date, Phone Number, Specify RTU

Models: 62E

1 40
Download 40 pages 12.7 Kb
Page 40
Image 40
START-UP CHECKLIST

START-UP CHECKLIST

I. PROJECT INFORMATION:

Job Name ____________________________

Start-Up Performed By __________________

ERV Unit Designation __________________

Date __________________________________

Phone Number ________________________

 

II. DESIGN INFORMATION:

 

Application ___________________________________________________________________________

CFM (Supply/Exhaust) _________________________________________________________________

External Static Pressure (Supply/Exhaust) __________________________________________________

Supply/Exhaust Configuration ____________________________________________________________

Voltage/Phase ________________________________________________________________________

ERV Unit Part Number _________________________________________________________________

Coupled to RTU or stand-alone___________________________________________________________

Specify RTU.

NOTE: Complete This Section for Coupled Applications Only

Model Number ________________________________________________________________________

HVAC Unit Discharge Type (Down discharge or horizontal discharge.)

____________________________

Roof Curb (Option)

Yes

No

14-in. Tall Roof Curb (Field Installed)

 

 

Horizontal Supply/Return Base (Field Installed)

 

 

Combination ERV-RTU Curb (Field Installed)

 

 

Horizontal Transition

 

 

NOTE: Complete This Section for Coupled Applications Only.

 

 

Transition Part Number (Field Installed)

 

 

Electrical Disconnect (Option)

Yes

No

Fused (Factory Installed)

 

 

Switched (Factory Installed)

 

 

Two-Position Motorized Dampers (Option)

Yes

No

Outside Air Damper (Factory Installed)

 

 

Exhaust Air Damper (Factory Installed)

 

 

Pre-Heater (Option)

Yes

No

kW _______________

 

 

Temp Control (Factory Installed)

 

 

Temp and Static Pressure Control (Factory Installed)

 

 

Frost Protection (Option) (Factory Installed)

Yes

No

NOTE: Do Not Use With Pre-Heater.

 

 

ERV Wheel VFD (Option) (Factory Installed)

Yes

No

Low Temperature Lock Out (Option) (Factory Installed)

Yes

No

Filter Maintenance Indicator (Option) (Factory Installed)

Yes

No

ERV Blower Maintenance Indicator (Option) (Factory Installed)

Yes

No

ERV Wheel Maintenance Indicator (Option) (Factory Installed)

Yes

No

Field-Installed Accessories

Yes

No

ERV Remote Mount Timer (Field Installed)

 

 

ERV Remote Control Readout (Field Installed)

 

 

Copyright 2010 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Catalog No. 04-53620007-01

Printed in U.S.A.

Form 62E-C1SI

Pg CL-1

8-10

Replaces: New

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - CUT ALONG DOTTED LINECUT ALONG DOTTED LINE

Page 40
Image 40
Carrier 62E Job Name, Start-UpPerformed By, ERV Unit Designation, Date, Phone Number, Specify RTU, Roof Curb Option, kW