Installation Instructions | PNR Series |
Swivel Tension Adjustment
CAUTION: DO NOT OVER TIGHTEN SWIVEL ADJUSTMENT NUT. Over tightening swivel adjustment nut will cause excessive wear and may distort adjustment components.
1.Using a 9/16” wrench (not provided), slightly tighten or loosen swivel tension adjustment nut. (See Figure 11)
2.Repeat until desired tilt tension is obtained.
Roll Tension Adjustment
1.If necessary, loosen or tighten roll tension adjustment nut. (See Figure 11)
2.Repeat until desired rotational tilt tension is obtained.
Swivel tension |
adjustment nut |
Roll tension |
adjustment nut |
Figure 11
Swing Arm Adjustments
The dual swing arms are shipped installed in the center of the top and bottom mounting brackets, which is the standard mounting configuration.
The top and bottom mounting brackets have slotted holes, allowing for lateral adjustment of the dual swing arms.
After installing top and bottom mounting brackets between two wood studs 16” on center, the swing arms can be adjusted or moved off center, depending on the location of the mount, size of display, and lateral movement needed to rotate the display.
The swing arms can be adjusted, as follows:
•Adjusting the Swing Arms Off-Center
With no disassembly required, you can adjust the swing arms up to
•Reconfiguring the Swing Arms Left of Center
With some disassembly and reassembly required, you can move the swing arms to the left of center by reconfiguring the mount. Use the first and third slotted holes in the top and bottom mounting brackets.
•Reconfiguring the Swing Arms Right of Center With some disassembly and reassembly, you can move the swing arms to the right of center by reconfiguring the mount. Use the third and fifth slotted holes in the top and bottom mounting brackets.
Adjusting the Swing Arms Off Center
1.Remove the display from the mount.
2.Loosen four bolts (two on the top and two on the bottom) securing the swing arm assembly to top and bottom mounting brackets (See Figure 12).
3.Move the swing arm assembly left or right within slots to desired location.
4.Tighten the bolts.
5.Install the display on the mount.
Top bolts |
Figure 12
11