78-5481-02 09/15/98

Installation - Subtended Network 8

Figure 8-8 shows the ferrite beads on the coaxial cable close to the BNC connectors on the DS3 subtend card.

Figure 8-8

Ferrite Beads Close to BNC Connectors

 

 

System

 

 

Ferrite

I/O card

 

 

DS3 BNC

bead

 

 

 

 

 

 

connector

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TX1

RX1

TX2

DS3 BNC connector

Ferrite

bead

16839

8.2.5 Completing the Installation

When the system I/O card on the subtended node and the DS3 subtending I/O card on the subtending host have been cabled and the DS3 subtending host module has been installed, complete the installation, provisioning, and connectivity tests as described in previous chapters of this manual.

Cisco 6100 Set Up and Installation Manual

8-9

Page 9
Image 9
Cisco Systems 6100 installation manual Completing the Installation