78-5481-02 09/15/98

Installation - Subtended Network 8

8.2 Installation Procedures - Subtending

The following table shows a check list of the installation steps for subtended 6100s. Then subsequent subsections, as noted in the last column of the Table 8-1, discuss each of the installation steps in detail.

Table 8-1

Installation Steps Checklist

 

 

Check

Installation Step

 

 

 

1. Install each of the Cisco 6100s in the system, including the subtended ones, with either DOH or direct

 

connect configuration as described in previous sections

 

 

 

2. Connect the DS3 subtending card to the MC backplane

 

 

 

3. Install the 2x DS3 subtending host module (STM) in slot 9 of the subtending host 6100 and the DS3

 

NI module in slot 10 of the subtended node MC

 

 

 

4. Cable the DS3 subtending I/O card on the subtending host MC to the system I/O card on the subtended

 

node MC

 

 

 

5. Complete the installation as described in the previous chapters, provision and test

 

 

MC=multiplexer chassis

NI=network interface

8.2.1 Installing the 6100s

Before connecting the subtended node 6100s to the subtending host 6100, install and cable all the 6100s, including the subtended ones, according to the procedures described in Chapters 5, 6, and 7 of this manual. Subtending is independent of the configuration style used. It works with both DOH and direct connect.

Cisco 6100 Set Up and Installation Manual

8-3

Page 3
Image 3
Cisco Systems installation manual Installation Procedures Subtending, Installing the 6100s