2-5
Cisco CRS-1 Carrier Routing System Multishelf System Upgrade and Conversion Guide
OL-12571-01
Chapter2 Converting to an Integrated Switch System
How to Convert from the Cisco Catalyst 65xx Switch to the Integrated Switch System for Single-FCC Multishelf and
Two-FCC Multishelf Systems
Partner node (0/RP1/CPU0) is in STANDBY role
Standby node in 0/RP1/CPU0 is ready
Reload and boot info
----------------------
RP reloaded Fri Feb 2 16:09:51 2007: 3 days, 1 hour, 46 minutes ago
Active node booted Fri Feb 2 16:09:51 2007: 3 days, 1 hour, 46 minutes ago
Standby node boot Fri Feb 2 16:13:40 2007: 3 days, 1 hour, 43 minutes ago
Standby node last went not ready Fri Feb 2 16:30:39 2007: 3 days, 1 hour, 26 minutes ago
Standby node last went ready Fri Feb 2 16:30:44 2007: 3 days, 1 hour, 26 minutes ago
There have been 0 switch-overs since reload
Redundancy information for node F0/SC0/CPU0:
==========================================
Node F0/SC0/CPU0 is in ACTIVE role
Partner node (F0/SC1/CPU0) is in STANDBY role
Standby node in F0/SC1/CPU0 is ready
Reload and boot info
----------------------
RP reloaded Fri Feb 2 16:13:39 2007: 3 days, 1 hour, 43 minutes ago
Active node booted Fri Feb 2 16:13:39 2007: 3 days, 1 hour, 43 minutes ago
Standby node boot Fri Feb 2 16:13:39 2007: 3 days, 1 hour, 43 minutes ago
Standby node last went not ready Fri Feb 2 16:48:07 2007: 3 days, 1 hour, 8 minutes ago
Standby node last went ready Fri Feb 2 16:48:12 2007: 3 days, 1 hour, 8 minutes ago
There have been 0 switch-overs since reload
Step 4 Repeat Step 1 to Step 3 for the remaining FCC.
Connecting the 22-port SCGE to an Active Cat6K (Single-FCC Multishelf and
Two-FCC Multishelf Systems)
To connect the standby 22-port SCGE to an active Cat6K and connect the 22-port SCGEs to each other
in a full mesh configuration, perform the following steps:
Step 1 Connect one port of the standby 22-port SCGE in each fabric chassis to the active Cat6K. Enable STP
and portfast on these ports from the Cisco Catal yst 65xx switch side.
Step 2 Connect the two newly inserted standby 22-port SCGE cards to each other in a Two-FCC Multishelf
System.
Step 3 Use the show controller switch inter-rack stp command in administration EXEC mode, with the
location keyword, to verify that all the new connections and ports are working correctly.
Step 4 Verify that the connected ports are bidirectional and that the port neighbors are correc t by using the show
controllers switch inter-rack udld command, with the all and location keywords, in administration
EXEC mode, as shown in the following syntax:
show controllers switch inter-rack udld {all location node-id}
Replace the node-id argument with the newly inserted standby 22-port SCGE card .
In addition, verify that the port is connected to an active Cat6K and is in the forwarding state (FWD) by
using the show controllers switch inter-rack stp command, with the ports and location keywords, in
administration EXEC mode, as shown in the following syntax:
show controller switch inter-rack stp {ports interface number location node-i d}